Pilot Proof-Load Test on Viaduct de Beek: Case Study

Eva O.L. Lantsoght, Rutger T. Koekkoek, Cor Van Der Veen, Dick A. Hordijk, Ane De Boer

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

18 Citas (Scopus)

Resumen

For existing bridges, proof-load testing can be a suitable assessment method. This paper addresses the evaluation of a posted reinforced concrete slab bridge over a highway through proof-load testing, detailing the preparation, execution, and analysis of the test. As the target proof-load and the required measurements for proof-load testing currently are not well-defined in the existing codes, this pilot case was used to develop and evaluate proposed recommendations for proof-load testing for a future guideline on proof-load testing for the Netherlands. Moreover, the pilot proof-load test is used to study the feasibility of proof-load testing for both shear and flexure.

Idioma originalInglés
Número de artículo5017014
PublicaciónJournal of Bridge Engineering
Volumen22
N.º12
DOI
EstadoPublicada - 1 dic. 2017

Huella

Profundice en los temas de investigación de 'Pilot Proof-Load Test on Viaduct de Beek: Case Study'. En conjunto forman una huella única.

Citar esto